News
New temporary exits opening on SR 400 starting Aug. 29
Summary by The Atlanta Editorial Desk · As published by Rough Draft Atlanta (intown neighborhoods)
· August 24, 2026
· 1 min read
Photo: Rough Draft Atlanta (intown neighborhoods) · view original
Story provenance No corrections
Summary created by The Atlanta Editorial Desk — automated, rule-governed Published by Rough Draft Atlanta (intown neighborhoods) Original story Read at the source Source published Aug 24, 2026 Indexed here Aug 24, 2026 AI assistance Automated summary drawn from the source’s own published text Prepublication human review No — editorial rules, flagged-item review, and published samples
Every story comes with a passport. How we work · Corrections log · Publisher’s note
Key points Two new exits, labeled 5A and 5B, will become available to drivers. A major highway project is underway, and temporary exits are being added.
Motorists will have new routes soon. A major highway project is underway, and temporary exits are being added. Two new exits, labeled 5A and 5B, will become available to drivers.
These changes are part of a larger effort to widen a state highway. The project involves adding four new lanes and designating certain construction zones.
Further information about the project, including a map, is available from the transportation department. This department has assured that access to certain destinations will remain open during the construction phase.
More News Today’s briefing Local events
Why this story is here
Rough Draft Atlanta (intown neighborhoods) reported and published this story. The Atlanta selected it, summarised the key facts above, and links to the original. We did not report this story and we added no reporting of our own to it.
About this story
As published by Rough Draft Atlanta (intown neighborhoods) . The Atlanta selects stories from publishers’ feeds, summarises them, and links back to the publisher that reported them. We add no reporting of our own. We attribute every source, link to the original report, and follow a documented editorial standards policy. To understand how stories are selected and reviewed, read our about page .
For the complete original report, visit Rough Draft Atlanta (intown neighborhoods) . Have a tip or correction? Contact the editor .
Category: News ·
Published: August 24, 2026 ·
Source: Rough Draft Atlanta (intown neighborhoods) ·
Reading time: 1 min
Frequently asked about this story
What is this story about? Motorists will have new routes soon. A major highway project is underway, and temporary exits are being added. Two new exits, labeled 5A and 5B, will become available to drivers. These changes are…
When was this published? This article was first published on August 24, 2026 by Rough Draft Atlanta (intown neighborhoods) and curated for The Atlanta readers.
Who reported this story? This story was reported by Rough Draft Atlanta (intown neighborhoods). To learn more about how The Atlanta selects and reviews stories, see our editorial standards .
Where can I find related coverage? See more News coverage from The Atlanta, or browse our daily briefing and topic hubs .
← Back to all news
More News →
Today’s briefing
Subscribe to newsletter